For Garland ISD, Imperial Construction completed a major renovation of the Williams Stadium track and field. This renovation consisted of pulling up the existing track and field surface and installing new surfaces to all areas.
Renovations included an installation of a full coverage of Regupol Abzorb 10mm Synthetic Turf Shock Padding. This padding provides superior cushioning beneath the synthetic turf surface. Imperial also completed the installation of a new drainage system and new concrete fire lane.
Architect: RLK Engineering
Location: Garland, Texas
Back To K-12 Projects